Jump to content

New HT Build


HAmmer32261

Recommended Posts

  • Replies 79
  • Created
  • Last Reply

Top Posters In This Topic

Finished up all the electrical today, Finish carpentry end of this week

then carpet on the 22nd, here's a few pics

here's some pics of the wall sconces,

Posted Image

Posted Image

Posted Image

Posted Image

Posted Image

Lutron Maestro wireless dimmers

Posted Image

Brass trim rings for the can lights

Posted Image

Plenty of power up front with 4 20amp circuits

Posted Image

Link to comment
Share on other sites

Finished the Electrical today, Finished carpentry this week then carpet on the 22nd

its getting close finally, should be almost 2 months to the day i started that it will be finished. here's a few pics

The Wall Sconces turned out nice

Posted Image

Posted Image

Posted Image

Posted Image

Posted Image

Lutron Maestro dimmers w/wireless remote

Posted Image

Brass trim on the can lights

Posted Image

Plenty of power up front with 4 20amp circuits

Posted Image

Link to comment
Share on other sites

John, the room looks great, I really like your choice of colors and accents. Looks like your toughest decision from here on is your grand opening movie selection.

enjoy!

Mark

Thx mark, i havent thought about that but now you got me thinkin

Link to comment
Share on other sites

The guys from the Mill Work store came out today and finished up

with the floor molding, window framing and they hung the new door.

i just gotta get the hardware and install it. the floor is getting sealed

on monday and then carpet next wednesday the 22nd. The seating is

getting delivered on thursday the 23rd then i can start moving all the audio gear in

and start setup. I'm going to wait and see how the room sounds with the carpet and furniture

b4 i buy any acoustic panels, im hoping i can save money by not having to get any.

IMG_1772_zps797a79a6.jpg

IMG_1773_zpsfcebddd4.jpg

IMG_1775_zps162fe78a.jpg

Link to comment
Share on other sites

Finished!!! The room construction if finally done about 2 months to the day we started.

i just started bringing a few items in and should have everything setup memorial day weekend.

i still have a couple bass trap panels for the back wall coming.

heres a few more pics

AFF72E21-CF6D-4B5E-B795-221F55048303-313

5AAFFD2B-57D9-41FA-91DD-A3D034FA4982-313

21E143EB-9869-463B-87DF-9A9C457CFC49-313

Link to comment
Share on other sites

Thx Ref and Swap [:D]

babadono i dont remeber where i downloaded that picture,

i brought it to a print shop here in town on a flashdrive but because its

a jpg file it was all distorted when she enlarged it to 24x30.

so she went online for me and found a Klipsch logo in Vector art format

and added the text with a adobe program and enlarged it for me it turned out great.

i got it printed on some good quality photo paper. then i went to Michael's crafts and got a 24x30 black

aluminum frame. they have the pic there on file at the print shop i went too

if you want to get one made up just PM me and ill send you the info.

they can do any size you want

they will ship it to you

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...