mungkiman Posted June 27, 2017 Author Share Posted June 27, 2017 1 hour ago, dtel said: Don't know what ICF's are. https://en.wikipedia.org/wiki/Insulating_concrete_form Quote Link to comment Share on other sites More sharing options...
JJkizak Posted June 27, 2017 Share Posted June 27, 2017 You know a little bit here, a little there, and pretty soon your up to 6 million dollars, just like This Old House. JJK 1 Quote Link to comment Share on other sites More sharing options...
oldtimer Posted June 27, 2017 Share Posted June 27, 2017 I might be funding a build soon, not sure I should post any of it with all the kibbutzers around here. Quote Link to comment Share on other sites More sharing options...
CECAA850 Posted June 28, 2017 Share Posted June 28, 2017 1 hour ago, oldtimer said: I might be funding a build soon, not sure I should post any of it with all the kibbutzers around here. You posts your posts you take your chances. 1 Quote Link to comment Share on other sites More sharing options...
oldtimer Posted June 28, 2017 Share Posted June 28, 2017 As you learned with your toe. Quote Link to comment Share on other sites More sharing options...
mungkiman Posted June 28, 2017 Author Share Posted June 28, 2017 Here's another perspective... Quote Link to comment Share on other sites More sharing options...
dirtmudd Posted June 28, 2017 Share Posted June 28, 2017 10 hours ago, oldtimer said: I might be funding a build soon, not sure I should post any of it with all the kibbutzers around here. Quote Link to comment Share on other sites More sharing options...
CECAA850 Posted June 28, 2017 Share Posted June 28, 2017 10 hours ago, oldtimer said: As you learned with your toe. I actually took it easy on you guys. Quote Link to comment Share on other sites More sharing options...
mungkiman Posted July 28, 2017 Author Share Posted July 28, 2017 Concrete forms are down, and the concretins have moved out. On to waterproofing, drainage, backfill, and radon system. Framing will start soonish. 2 Quote Link to comment Share on other sites More sharing options...
dirtmudd Posted July 29, 2017 Share Posted July 29, 2017 6 hours ago, mungkiman said: Concrete forms are down, and the concretins have moved out. On to waterproofing, drainage, backfill, and radon system. Framing will start soonish. you have a lot going on there...love the poured walls.. the rest of the structure..is going to be stick built ? so what the finished product going to look like ? Quote Link to comment Share on other sites More sharing options...
mungkiman Posted July 29, 2017 Author Share Posted July 29, 2017 6 minutes ago, dirtmudd said: you have a lot going on there...love the poured walls.. This represents maybe two thirds of the scope. There will be 2 more phases of excavation and concrete, as well as a second phase of framing. 16 minutes ago, dirtmudd said: the rest of the structure..is going to be stick built ? Yes, but with some trusses in the roof system. 17 minutes ago, dirtmudd said: so what the finished product going to look like ? I'll continue to share photos, as I don't have permission to share plans. 1 Quote Link to comment Share on other sites More sharing options...
dirtmudd Posted July 29, 2017 Share Posted July 29, 2017 2 minutes ago, mungkiman said: This represents maybe two thirds of the scope. There will be 2 more phases of excavation and concrete, as well as a second phase of framing. Yes, but with some trusses in the roof system. I'll continue to share photos, as I don't have permission to share plans. how many sq.ft ? Quote Link to comment Share on other sites More sharing options...
mungkiman Posted July 29, 2017 Author Share Posted July 29, 2017 On 7/28/2017 at 6:02 PM, dirtmudd said: how many sq.ft ? Hard (for me) to say. Quote Link to comment Share on other sites More sharing options...
mungkiman Posted August 9, 2017 Author Share Posted August 9, 2017 It's not yet Friday, but things are moving along. Quote Link to comment Share on other sites More sharing options...
JJkizak Posted August 9, 2017 Share Posted August 9, 2017 4 minutes ago, mungkiman said: It's not yet Friday, but things are moving along. Are you making a video of this project like I did? JJK Quote Link to comment Share on other sites More sharing options...
mungkiman Posted August 9, 2017 Author Share Posted August 9, 2017 33 minutes ago, JJkizak said: Are you making a video of this project like I did? JJK I've taken several short videos of specific things happening, but that's it so far. On a previous project, the client set up a job cam so that he could watch remotely. It took and recorded a single still every 10 minutes during work hours, and the result was a "movie" of his house being built in stop animation. Quote Link to comment Share on other sites More sharing options...
CECAA850 Posted August 9, 2017 Share Posted August 9, 2017 2 hours ago, mungkiman said: On a previous project, the client set up a job cam so that he could watch remotely. It took and recorded a single still every 10 minutes during work hours, and the result was a "movie" of his house being built in stop animation. I've seen videos like that before and really enjoy watching them. Quote Link to comment Share on other sites More sharing options...
babadono Posted August 9, 2017 Share Posted August 9, 2017 Again shoulda used ICFs. I my ICF built house. Quote Link to comment Share on other sites More sharing options...
mungkiman Posted August 10, 2017 Author Share Posted August 10, 2017 3 hours ago, babadono said: Again shoulda used ICFs. I my ICF built house. If you were my client, it could be... Quote Link to comment Share on other sites More sharing options...
mungkiman Posted September 1, 2017 Author Share Posted September 1, 2017 Rat Slabs: Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.